MCS, RECC and leads: the rules installers should know
Updated 17 November 2026
The MCS certification solar and battery installers hold now comes with a Customer Commitment on marketing, and the RECC code makes you answer for any lead source you use. HIES members may not buy leads at all. Before anyone runs ads or makes calls for you, put the code's terms into the agreement.
What does MCS certification require of solar installers?
A certification body's sign-off that your firm can design and install to MCS standards, with named people to answer for it. MCS says you apply to an independent installer certification body, show how you engage skilled and competent people for the roles the scheme needs, and document the processes that make each installation meet its requirements. A Technical Supervisor 'will need to sign off every installation'.
Certification covers small-scale systems up to 50 kW for electrical technologies, and the certification bodies list solar PV and battery storage as separate scopes.
The scheme itself is changing. Under MCS's redeveloped scheme, installers hold a new Installer Agreement directly with MCS, the window for creating a certificate goes from 14 days to 30, complaints are handled centrally, and consumer code membership is no longer mandatory. MCS says most installers will move across during 2026, with their certification body managing the move.
Why does MCS certification matter for leads?
Because it decides who will buy from you. MCS says a homeowner needs an MCS certified installer to be paid for exported power under the government's SEG scheme, that many insurers require certification for renewables fitted at the policyholder's address, and that an installation cannot be certified after the event.
It is also a free route to enquiries. Certified installers are listed on MCS's Find an Installer tool, which homeowners use to search for a certified firm. How to get solar leads without door knocking covers the other free routes.
What does the MCS Customer Commitment say about marketing?
That it must not mislead or pressure, and every MCS certified installer has to follow it, whatever consumer code they belong to. Issue 1.1, dated 8 September 2026, says installers must not make 'any misleading claims in their sales or marketing activities', must not use 'a headline price in their marketing that misleads you about the likely cost', and must not pressure customers to sign orders or contracts with them or with any third party they work with.
That covers ads someone else runs for you. If the ad carries your name, it is your marketing, and the claims in it are yours to stand behind.
What does the RECC code say about leads?
That they are your responsibility, wherever they come from. Version 9 of the code, published on 1 July 2026, says members who obtain leads from third parties are 'responsible for ensuring' those third parties 'have been trained in, and have complied with, all the relevant conditions of the Code' (clause 5.1.1).
The same clause says compliance with the code, data protection law and the relevant MCS standards 'must be an explicit condition of any agreement' with the third party, and that the member 'will be responsible for any non-compliance with the Code by the third party'.
Around it sit the rules on promotion. Members promoting by phone or post must check the Telephone and Mailing Preference Services first, and must not contact anyone registered on them. Claims about savings or payback in ads must be 'clearly attributed to a reputable source'. And members are 'held responsible for all the actions of their Employees and of those who sell on their behalf' (section 5.2).
What does the HIES code say about leads?
It is stricter. Version S of the HIES Code of Practice, circulated in August 2026, says: 'Installers must not buy leads or generate leads through "lifestyle surveys" and must only use or generate leads where consumers have properly consented to the use of their data' (clause B2.2).
The same code says lead generation must be fair and lawful, with consent obtained under data protection law and the Telephone and Mailing Preference Services respected (B2.1). Members must never make direct marketing calls between 9pm and 9am (B3.1), and lead generation fees cannot be counted in what a homeowner pays when they cancel (F2.2).
If you belong to HIES, ask HIES how it views any arrangement in which you pay for leads or surveys before you sign one. That includes ours.
Which rules apply to which firm?
| Rule | Who it binds | What it says about leads and marketing |
|---|---|---|
| MCS Customer Commitment, issue 1.1 (September 2026) | Every MCS certified installer | No misleading sales or marketing claims, no misleading headline price, no pressure to sign |
| RECC code, clause 5.1.1 (version 9, July 2026) | RECC members | You answer for any third party you get leads from, and the agreement must require them to comply |
| HIES code, clause B2.2 (version S) | HIES members | No buying leads, no lifestyle surveys, consented leads only |
| ICO guidance on electronic marketing | Every firm that markets by phone, text or email | Consent must name your firm; generic consent covering any third party is not enough |
Trading Standards' guidance for the sector sums up all four: 'If a business is paying for leads, then it is everything to do with them.'
How do you stay inside the codes when someone else runs your ads?
Keep the ads, the consent and the paperwork in your name:
- Run the ads in your own name and your own ad account, so the enquiry is a request to you and nobody else holds the homeowner's details.
- Approve every ad before it runs, because the claims in it are yours under the Customer Commitment and your code.
- Make sure the form's consent wording names your firm, and keep a record of what each person agreed to and when, as the ICO advises.
- Put the clause 5.1.1 condition into the agreement if you are a RECC member, and ask HIES first if you are a HIES member.
That is the arrangement The Solar Lead Co is built on. The ads run in your name and your own account at no charge, the ad spend goes from your card to Meta, and you pay us only for surveys you attended. Facebook ads for solar installers covers what those ads may say, and buying solar leads lists the questions to put to any seller.
Questions
What are the MCS certification requirements?
You apply to an independent installer certification body and show that your firm meets MCS's standards: named people in the scheme's roles, including a Technical Supervisor who signs off every installation, and documented processes that make each job meet the requirements. Certification covers electrical systems up to 50 kW. Under the redeveloped scheme you also sign an Installer Agreement directly with MCS.
Is consumer code membership still required for MCS?
Not under MCS's redeveloped scheme, which lists 'consumer code membership no longer mandatory' among its changes; MCS says most installers move across during 2026. Every MCS installer must still follow MCS's Customer Commitment, and if you remain a member of RECC or HIES, that code's rules on leads and marketing still bind you.
What is the RECC code?
The Renewable Energy Consumer Code sets the standards its members must meet when they sell to and contract with homeowners, from advertising and sales visits to quotations, deposits and cancellation rights. Version 9 was published on 1 July 2026. Its clause 5.1.1 makes members responsible for any third party they get leads from, and that condition must be written into the agreement.
Can a HIES member buy solar leads?
Clause B2.2 of the HIES code, version S, says installers 'must not buy leads or generate leads through "lifestyle surveys"', and must only use or generate leads where consumers have properly consented to the use of their data. If you are a HIES member, ask HIES how it views any paid lead or survey arrangement before you enter one.
Am I responsible if my lead supplier breaks the rules?
Yes. The RECC code says a member 'will be responsible for any non-compliance with the Code by the third party' it gets leads from. The ICO says the firm instigating marketing calls or messages is responsible even when someone else makes them. Trading Standards' guidance says that if a business is paying for leads, it is everything to do with them.
Find out your price per lead in 15 minutes.
One call, no obligation. You'll know what each lead costs before you hang up.
Book a no-obligation callMore from the blog
Sources
- Becoming certified, MCS. Read 17 November 2026.
- What is the redeveloped Scheme?, MCS. Read 17 November 2026.
- Customer Commitment, issue 1.1 (8 September 2026), MCS. Read 17 November 2026.
- Smart Export Guarantee: consumers, MCS. Read 17 November 2026.
- Use MCS to market your business, MCS. Read 17 November 2026.
- Renewable Energy Consumer Code, version 9 (1 July 2026), RECC. Read 17 November 2026.
- HIES Code of Practice, version S, HIES. Read 17 November 2026.
- Electronic and telephone marketing (Guide to PECR), Information Commissioner's Office. Read 17 November 2026.
- Domestic energy saving: part 1, promotion, Business Companion (Chartered Trading Standards Institute). Read 17 November 2026.